Absolute Risk Technology Absolute Risk Technology Start an enquiry

Systems integration and safety assurance for major infrastructure.

We take complex, multi-supplier systems such as signalling, telecoms, power and control, make them work together, prove they are safe, and get them ready to operate.

A London based engineering consultancy, working across the United Kingdom, Ireland, the United Arab Emirates and Saudi Arabia.

Clients, partners and accreditations

Programmes we have delivered on

Six programmes across four countries, and what we were brought in to do on each of them.

Aerial view of the HS2 Old Oak Common station under construction

HS2 Old Oak Common Terminal

United Kingdom

Systems integration

Piling rigs at work on the NEOM Oxagon site in the desert

NEOM Oxagon Village

Saudi Arabia

Project management and planning, design and construction services

Engineers working in a Crossrail running tunnel

Crossrail

United Kingdom

Engineering safety management, systems integration

High speed trains at a Great Western Main Line platform

Great Western Main Line resignalling

United Kingdom

Systems safety, technical assurance and assessment

Controller at a signalling workstation in a transport control centre

National Transport Control Centre

Ireland

Project and risk management, telecommunications engineering, operational readiness, systems integration, testing and commissioning

Etihad Rail passenger train crossing the desert

Etihad Rail

United Arab Emirates

Systems integration, systems safety and assurance, technical risk management

Where we join a programme

We come in wherever the risk sits, and stay long enough to hand over something that works.

  1. 1

    Feasibility

    Options, constraints and the risks that will shape the design.

  2. 2

    Design

    Requirements, interfaces and a safety case that holds up.

  3. 3

    Integration

    Getting multi-supplier systems to behave as one system.

  4. 4

    Test and commission

    Proving it on site, with the evidence the regulator expects.

  5. 5

    Operational readiness

    People, procedures and rehearsals before day one of service.

  6. 6

    Operate and maintain

    Asset data and maintenance regimes for the decades that follow.

Independent by design

We do not supply the systems we assess, so our findings carry no commercial interest.

Engineers on the ground

The people who write the strategy are the people who turn up for testing.

Interfaces first

Most programme delay happens between suppliers rather than inside them. That is where we start.

Start an enquiry

Tell us what stage you are at and we will put the right engineer on the call rather than a salesperson.

Useful to include:

  • The programme and the phase it is in
  • The systems or assets in scope
  • The assurance regime you are working to
  • When you need people mobilised

Go to the contact page

Office
1st floor, 6 Coptic Street WC1A 1NW,
London United Kingdom
Elsewhere

LinkedIn